-
Production-hardening milestone (v0.7)
Verified Completed and passed: configuration security, error handling, backup safety, and route-validation audits.
-
Operator rehearsal (v0.8 B1)
Verified Completed and passed: full local publishing and recovery rehearsal, production checks, integrity scan, backup, dry-run restore, and edit-rejection behavior.
-
Hosted dashboard beta (v0.8 B2)
Verified Completed: the dashboard runs as a hosted service with persistent storage; owner login, site-scoped client access, site-scoped client publishing, off-host backups, and per-site deploy targets verified.
-
Real-site pilot validation (June 10, 2026)
Verified Trilingual client site ingested, chrome locked, locked-slot edits rejected, full export deployed to an isolated pilot project and live-verified.
-
Current client-use evidence
Pending A fresh client-use review is pending. The dated pilot and hosted-beta evidence below describe what was checked; they do not establish a current count of active client sites.
-
Public editing sandbox live (July 4, 2026)
Verified A separate demo instance now lets anyone try the real editor on a fictional business (Bright Bakery): the sign-in is prefilled, edits render live, structure-breaking attempts are rejected by the Guardian, rollback works, and the sandbox resets itself every 30 minutes. Deploys and pushes are disabled in the sandbox; it runs apart from the production instance.
-
Sustained-use evidence and scaling
Pending The next milestone: enough real editing history to describe client experience and reliability under sustained use, then onboarding further sites as the workflow stays stable.